Troy Lee Desgins 26.1 Flowline Se MIPS Helmet Hydro Sage/Charcoal
Regular price
$34995
Unit price
/
Unavailable
Tax included.
Shipping calculated at checkout
Sizing Chart
Troy Lee Designs Helmets Flowline
cm
inches
Troy Lee Desgins 26.1 Flowline Se MIPS Helmet Hydro Sage/Charcoal - X-Small / Small
is backordered and will ship as soon as it is back in stock.
Free Shipping on orders over $120 (excludes some large/oversized items) AUS only.
$20 Flat rate Express Shipping option available for non-bulky items. Usually delivered the next business day (Metro Areas) AUS only.
Same Day Dispatch on orders before 2pm (excludes supplier stock).
Delivery times will vary from 2-5 business days for metro areas and 7-14 business days for rural and remote areas.
Please see our full Shipping Policy here
Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets. The Hydro Sage and Charcoal colourway delivers understated style that complements any riding setup.
KEY FEATURES
3-Way adjustable screwless visor
Mips® B-Series Rotational Impact Brain Protection System
Full 360-degree fit retention system with 3-way rear height adjustment
14 vents for maximum airflow
Full wrap in-mold construction
Extended Coverage MTB Trail Helmet
Fidlock® Magnetic Buckle System
Dual Density EPS for low and high-speed impacts
Anti-microbial Quick Dry Premium Liner
Side strap adjusters
Payment & Security Payment methods
American Express
Apple Pay
Google Pay
Mastercard
PayPal Shop Pay
Union Pay Visa
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
<div class="dynamic-checkout__content" id="dynamic-checkout-cart" data-shopify="dynamic-checkout-cart"> <shopify-accelerated-checkout-cart wallet-configs="[{"supports_subs":true,"supports_def_opts":false,"name":"shop_pay","wallet_params":{"shopId":27030814790,"merchantName":"Crooze","personalized":true}},{"supports_subs":false,"supports_def_opts":false,"name":"paypal","wallet_params":{"shopId":27030814790,"countryCode":"AU","merchantName":"Crooze","phoneRequired":true,"companyRequired":false,"shippingType":"shipping","shopifyPaymentsEnabled":true,"hasManagedSellingPlanState":null,"requiresBillingAgreement":false,"gatewayType":"CONNECTED","merchantId":"DB7GEBV6JDYJJ","sdkUrl":"https://www.paypal.com/sdk/js?components=buttons\u0026commit=false\u0026currency=AUD\u0026locale=en_US\u0026client-id=AexZEtAxk09Ncgj6FSWFFyGKbxxAZ_LTyJ2DPdJWl1YUlecinmc5AfIaRF2qYjWlusWahlzz6SVkY5Ci\u0026merchant-id=DB7GEBV6JDYJJ\u0026intent=authorize","serviceableCountryCodes":["AU","GB","NZ","US"]}}]" access-token="2dc5c76303844171dac7e13bc3a4fcf0" buyer-country="AU" buyer-locale="en" buyer-currency="AUD" shop-id="27030814790" cart-id="fe27301dbfb276410e23019161761b91" enabled-flags="["a1d1f9a1"]" > <div class="wallet-button-wrapper"> <ul class='wallet-cart-grid wallet-cart-grid--skeleton' role="list" data-shopify-buttoncontainer="true"> <li data-testid='grid-cell' class='wallet-cart-button-container'><div class='wallet-cart-button wallet-cart-button__skeleton' role='button' disabled aria-hidden='true'> </div></li><li data-testid='grid-cell' class='wallet-cart-button-container'><div class='wallet-cart-button wallet-cart-button__skeleton' role='button' disabled aria-hidden='true'> </div></li> </ul> </div> </shopify-accelerated-checkout-cart> </div>