Troy Lee Desgins 26.1 Flowline MIPS Helmet Point Caper/Prune
Regular price
$24995
Unit price
/
Unavailable
Tax included.
Shipping calculated at checkout
Sizing Chart
Troy Lee Designs Helmets Flowline
cm
inches
SIZE SIZE RANGE SHELL EPS HEADLINE CROWN COMPATIBILITY RETENTIONN SYSTEM SIZE VISOR SIZE
YOUTH 48 - 53 Y Y 6 Y OS Y
XS / S 53 - 56 S S 6 XS / S OS OS
M / L 57 - 59 M M 6 M /L OS OS
XL / XXL 60 - 63 L L 6 XL / XXl OS OS
All Troy Lee Designs size charts
Troy Lee Desgins 26.1 Flowline MIPS Helmet Point Caper/Prune - X-Small / Small
is backordered and will ship as soon as it is back in stock.
Free Shipping on orders over $120 (excludes some large/oversized items) AUS only.
$20 Flat rate Express Shipping option available for non-bulky items. Usually delivered the next business day (Metro Areas) AUS only.
Same Day Dispatch on orders before 2pm (excludes supplier stock).
Delivery times will vary from 2-5 business days for metro areas and 7-14 business days for rural and remote areas.
Please see our full Shipping Policy here
Don't let its casual looks fool you. The Flowline MIPS helmet combines Troy Lee Designs' proven protection technology with everyday comfort at an accessible price. Its clean, understated design hides serious performance—backed by years of helmet engineering expertise and a Five-Star safety rating from Virginia Tech. MIPS technology adds an extra layer of rotational impact protection, making this the smart choice for riders who refuse to compromise on safety without breaking the bank.
KEY FEATURES
3-Way adjustable screwless visor
Mips® B-Series Rotational Impact Brain Protection System
Full 360-degree fit retention system with 3-way rear height adjustment
14 vents for maximum airflow
Full wrap in-mold construction
Extended Coverage MTB Trail Helmet
Side strap adjusters
Payment & Security Payment methods
American Express
Apple Pay
Google Pay
Mastercard
PayPal Shop Pay
Union Pay Visa
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.
<div class="dynamic-checkout__content" id="dynamic-checkout-cart" data-shopify="dynamic-checkout-cart"> <shopify-accelerated-checkout-cart wallet-configs="[{"supports_subs":true,"supports_def_opts":false,"name":"shop_pay","wallet_params":{"shopId":27030814790,"merchantName":"Crooze","personalized":true}},{"supports_subs":false,"supports_def_opts":false,"name":"paypal","wallet_params":{"shopId":27030814790,"countryCode":"AU","merchantName":"Crooze","phoneRequired":true,"companyRequired":false,"shippingType":"shipping","shopifyPaymentsEnabled":true,"hasManagedSellingPlanState":null,"requiresBillingAgreement":false,"gatewayType":"CONNECTED","merchantId":"DB7GEBV6JDYJJ","sdkUrl":"https://www.paypal.com/sdk/js?components=buttons\u0026commit=false\u0026currency=AUD\u0026locale=en_US\u0026client-id=AexZEtAxk09Ncgj6FSWFFyGKbxxAZ_LTyJ2DPdJWl1YUlecinmc5AfIaRF2qYjWlusWahlzz6SVkY5Ci\u0026merchant-id=DB7GEBV6JDYJJ\u0026intent=authorize","serviceableCountryCodes":["AU","GB","NZ","US"]}}]" access-token="2dc5c76303844171dac7e13bc3a4fcf0" buyer-country="AU" buyer-locale="en" buyer-currency="AUD" shop-id="27030814790" cart-id="f48dc552d5624401c84c2acb3345e263" enabled-flags="["a1d1f9a1","f5afabb3","370070f3","b311f899"]" > <div class="wallet-button-wrapper"> <ul class='wallet-cart-grid wallet-cart-grid--skeleton' role="list" data-shopify-buttoncontainer="true"> <li data-testid='grid-cell' class='wallet-cart-button-container'><div class='wallet-cart-button wallet-cart-button__skeleton' role='button' disabled aria-hidden='true'> </div></li><li data-testid='grid-cell' class='wallet-cart-button-container'><div class='wallet-cart-button wallet-cart-button__skeleton' role='button' disabled aria-hidden='true'> </div></li> </ul> </div> </shopify-accelerated-checkout-cart> </div>