Troy Lee Desgins 26.1 Flowline Se MIPS Helmet Stacks Charcoal/Sienna

Sale price $338.99 Regular price $349.95
Tax included. Shipping calculated at checkout
SIze
Availability
  • Supplier Warehouse Low stockUsually dispatched within 3-5 business days
See what delivery costs

Seen a lower price? Contact us.

Mips® equipped and eMTB-rated, Flowline SE sets the standard for safety within a modern, minimalist design, achieving a five-star safety rating from Virginia Tech. With 14 vents, an anti-microbial liner, and a Fidlock® magnetic buckle system, Flowline SE is the workhorse of trail helmets.

KEY FEATURES
  • 3-Way adjustable screwless visor
  • Mips® B-Series Rotational Impact Brain Protection System
  • Full 360-degree fit retention system with 3-way rear height adjustment
  • 14 vents for maximum airflow  
  • Full wrap in-mold construction
  • Extended Coverage MTB Trail Helmet
  • Fidlock® Magnetic Buckle System
  • Dual Density EPS for low and high-speed impacts
  • Anti-microbial Quick Dry Premium Liner
  • Side strap adjusters

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.