Sold out
Sold out
Sold out
15% off
Troy Lee Desgins 26.1 Flowline Se Mtb Helmet MIPS Phantom White
Regular price
$319.95
Tax included.
Shipping calculated at checkout
Availability
DISCIPLINE: Trail
Equipped with Mips® and eMTB-certified, the Flowline SE raises the bar for safety in a sleek, modern design, earning a five-star rating from Virginia Tech. Featuring 14 vents, an antimicrobial liner, and a Fidlock® magnetic buckle system, the Flowline SE stands out as a reliable, do-it-all trail helmet.
KEY FEATURES
- 3-Way adjustable screwless visor
- Mips® B-Series Rotational Impact Brain Protection System
- Full 360-degree fit retention system with 3-way rear height adjustment
- 14 vents for maximum airflow
- Full wrap in-mold construction
- Extended Coverage MTB Trail Helmet
- Fidlock® Magnetic Buckle System
- Dual Density EPS for low and high-speed impacts
- Anti-microbial Quick Dry Premium Liner
- Side strap adjusters
Payment & Security
Payment methods
Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.




