Troy Lee Designs Flowline Short

Sale price $63.99 Regular price $174.95
Tax included. Shipping calculated at checkout
Size
Availability
  • Supplier Warehouse In StockUsually dispatched within 3-5 business days
See what delivery costs

Seen a lower price? Contact us.

 Specifications

  • Ride Fit

  • Blue Sign Certified Mechanical Stretch Woven Fabric

  • Optimal 2 Deep Hand Pockets

  • Self-Fabric Waist Adjusters

  • Zipper Fly with Snap Closure

The Troy Lee Designs Flowline Short is a high-performance mountain biking essential, combining comfort, durability, and style. Engineered with avid riders in mind, these shorts offer a perfect balance between flexibility and toughness, ensuring maximum freedom of movement while tackling rough terrains. Constructed from premium materials, they withstand the rigors of off-road adventures and provide excellent moisture-wicking properties to keep riders dry and comfortable during intense rides. With a sleek and modern design, the Flowline Short is not only functional but also a fashion statement on the trail. Whether you're a seasoned pro or a weekend warrior, these shorts are a must-have addition to your biking gear collection, ensuring a smooth and stylish ride every time.

Payment & Security

Payment methods

  • American Express
  • Apple Pay
  • Google Pay
  • Mastercard
  • PayPal
  • Shop Pay
  • Union Pay
  • Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.